How we install air conditioning, stage by stage
Most of what makes an installation last can’t be seen once it’s finished: sealed joints, dry pipes, the right amount of refrigerant. Here’s what we do at each stage, and why; the numbers are under “The detail”.
At a glance
- Every room measured; the outdoor spot checked for noise, planning and space.
- Walls scanned and checked for asbestos before drilling.
- Pipework pressure-tested with nitrogen, then held under vacuum to prove it’s dry.
- Any refrigerant added is weighed in, never guessed.
- Electrics by a registered electrician, never by us.
- Two certificates at the end: the electrician’s, and Buckinghamshire Council’s for the air conditioning itself.
- Every reading emailed to you that evening.
- Refrigerant work by an F-Gas certified engineer (Category I), for an F-Gas certified company.
1. Survey and design
What we do. We measure every room to size each unit, check the outdoor spot for noise, planning and space, and plan the pipe route, drain and electrics.
Why it matters. A cramped outdoor unit works harder and is likelier to leak.
The detail
- Noise: 37 dB(A), 1 m out from each neighbouring habitable-room window and door, by the MCS 020 a) method that permitted development requires.
- Space: Daikin’s clearances on every side, away from bedrooms, its water kept off paths. In cooling, blocked airflow raises the pressure, cuts efficiency and raises the leak risk.
- R32: above 1.842 kg in one system, every room with an indoor unit must be larger than Daikin’s minimum floor area for that charge. We check before quoting.
2. Protecting your home
What we do. Dust sheets from the door, overshoes on every time, and work areas agreed with you and kept clear of children and pets. Everything leaves with us: packaging, offcuts and any old unit.
Why it matters. If we mark anything, we put it right at our cost.
The detail
- We confirm the day in writing beforehand, with a short list of what helps: clear space where each unit goes, and access to your fuse box and, if the pipes go through it, your loft.
- At every break and each evening: ladders down, tools away, holes covered, nothing left open or live. On a longer job, we tell you what not to switch on until we’re back.
3. Taking out an old system
What we do. Its refrigerant is recovered, never let out, and the units go for recycling that day, with paperwork to prove it. Old pipework is never reused.
Why it matters. Released refrigerant harms the climate, and old refrigerant is hazardous waste that must be tracked.
The detail
- Recovered with a machine rated for that gas into an empty cylinder kept for it alone, weighed throughout. The units travel with a consignment note.
- Recovered by our F-Gas certified engineer (Category I), for an F-Gas certified company.
- Unwanted refrigerant and oil are hazardous waste; owners share the duty of care, and the law asks each to keep the paperwork for at least three years.
- R22 can’t legally be topped up. Once a system on it develops a fault, there are three options: switch it off, convert it to another refrigerant, or replace it. We advise switching it off and replacing it.
4. Drilling and fixing
What we do. Walls are scanned for cables and pipes, and checked for asbestos, before drilling. Each hole is cored with the dust caught, sloped outward, then sleeved and sealed.
Why it matters. Cables and pipes are found first, and a sealed, sloped hole keeps the weather out.
The detail
- Holes are the size Daikin’s manual asks for: 65 mm for most indoor units, 80 mm for some larger ones.
- No hole in line with a socket or switch, near the boiler’s pipes, or within 150 mm of a ceiling or corner without the electrician’s say-so.
- In a house built in 2000 or before, or of unknown date, a core through a cavity we can’t see into is tested for asbestos first.
5. Pipework and joints
What we do. Unless the survey planned another, the only joints indoors are at the indoor unit, made without a flame and tightened to Daikin’s figure. Pipes run as short and straight as the house allows, insulated throughout, without crushed bends.
Why it matters. Fewer joints, fewer places to leak; unbroken insulation and smooth bends keep it efficient.
The detail
- These are flare joints, tightened with a torque wrench to Daikin’s figure; the tools are kept for R32 only.
- A brazed joint only where the survey planned one: before the pipe meets the outdoor unit, with nitrogen flowing, a detector running, extinguishers ready and an hour’s fire watch. Refrigerant in a flame gives off toxic fumes.
- What refrigeration training teaches for efficiency: pipe runs short and straight, insulation intact and out of the sun, little pressure drop.
- Under the F-gas rules, joining the pipes counts as installation even before any refrigerant goes in, so our F-Gas certified engineer does it.
6. The pressure test
What we do. Before any refrigerant goes in, the pipes are filled with nitrogen at high pressure and left to stand. Any drop is found and fixed.
Why it matters. Nitrogen escapes through any gap refrigerant could, so a weak joint shows now, not next summer.
The detail
- BS EN 378, the standard for these tests, describes two: a short strength test, proving no joint bursts and no pipe deforms, then a longer tightness test, held as long as practical so any drop shows.
- As an example, refrigeration training uses 34 bar g for an R32 system’s tightness test. The exact figures depend on the refrigerant and the manufacturer, so ours come from Daikin’s manual for each model.
- Nitrogen’s pressure moves with temperature: about 0.12 bar per °C at that pressure. A tight system that ends 5 °C cooler reads 0.6 bar lower, so we note the pipe temperature at both ends.
- Our procedure: a regulator with a relief valve; steps of up to 3 bar; never above the nameplate’s maximum; readings to 0.1 bar; everyone else kept clear; a window open wherever there’s a joint; a result per room on a multi-split.
7. The vacuum
What we do. With the nitrogen let out, a pump draws out the air and moisture. We read the vacuum on its own gauge, then shut the pump off to prove it holds.
Why it matters. Moisture and the wrong amount of refrigerant can shorten a compressor’s life.
The detail
- Target: 500 microns (0.5 Torr) or lower, where training allows up to 2,000; deeper if Daikin’s manual asks. The air around us is 760,000 microns.
- Even at 2,000 microns, water boils at about −10 °C, so any moisture in the pipes boils off and is pumped away. Moisture left in forms acid; air left in wastes energy.
- Read on a micron gauge, not the pump’s. In the rise test, a creeping reading means moisture is still boiling off, so we pump on and retest. If it won’t reach or hold and we can’t find why, work stops.
8. Adding the refrigerant
What we do. Daikin’s outdoor unit arrives with refrigerant inside. Where the pipe length needs more, we weigh the extra in to Daikin’s figure and fill in the unit’s label.
Why it matters. A split needs its maker’s exact amount, and gauges can’t measure it.
The detail
- Splits are “critically charged”: the amount must be the maker’s, and service-port gauges can’t show it. Running pressures only hint, as the compressor speeds up and slows down. A system found short with no leak may never have been charged correctly.
- R32 only: global warming potential 675, about a third of R410A’s 2,088; classed A2L, mildly flammable. The label gives the charge and its CO2 equivalent: 1 kg of R32 counts as 0.675 tonnes.
- Charged by an F-Gas certified engineer (Category I), for an F-Gas certified company.
9. The electrics
What we do. A registered electrician does all the wiring, including the cable between the units, and tests it before switch-on. The certificate comes in their name.
Why it matters. A new circuit is notifiable work under Part P, and we never do the electrics ourselves.
The detail
- Every cover goes on before switch-on, and nobody works inside a unit during a test run. A multi-split gets a wiring check, room by room.
10. The drain
What we do. Each drain falls all the way to a gully, a rainwater downpipe or free-draining ground, and is water-tested before it’s boxed in. If it can’t fall, a pump lifts it.
Why it matters. A dipped or blocked drain can put water on the wall.
The detail
- About a litre of water, poured in with the filters out, must reach the end without a leak. Daikin allows no trap, so no soil-stack connection for now. A pump gets its own supply and an alarm that stops the system.
11. Commissioning and handover
What we do. We run Daikin’s commissioning checklist room by room, in cooling and, weather allowing, heating, recording the temperatures. Then we show you the controls and set each bedroom up for sleep.
Why it matters. Each yearly Health Check service compares against those readings, so slow changes show early.
The detail
- Per room and mode: set point, minutes run, air in and out, and the difference against Daikin’s figure where given; error codes, fans, noise. On a single split, the second mode only if the weather allows.
- Pressures are optional: Daikin asks for none, and they can’t show a split’s charge. A temperature difference that shrinks over the years can be an early sign of a leak. Daikin’s checklist is signed by us both.
12. Your paperwork
What we do. That evening we email your commissioning record, with every test figure and reading. Your electrician sends you their certificate afterwards. We tell Buckinghamshire Council’s building control the work is finished, and send you their completion certificate when it comes.
Why it matters. The record is your system’s history. Our warranty: five years on the parts, and two on the labour, or five if you join Chillston Care within 30 days. It holds while we service the system every year: Chillston Care books that for you.
The detail
- With photos and routes of the pipes and cables, the asbestos check and the manuals, the record makes your system’s health and safety file.
- Air conditioning is building work under Part L of the Building Regulations, as well as the electrics under Part P. Before the work starts, we give Buckinghamshire Council’s building control a building notice; within five days of finishing, we tell them it’s complete and commissioned. Their completion certificate goes in your file, and a buyer’s solicitor can ask for it.
- By law, leak checks and their records start at 5 tonnes CO2e, about 7.4 kg of R32. Most home systems are well under; we keep yours anyway, for at least five years.
13. Safety on the day
What we do. Everyone on site reads the job’s safety plan first, and work stops if anything is unsafe. Cylinders stay outside your house, and rooms with open pipework are ventilated.
Why it matters. R32 is mildly flammable, so no flame or spark goes near it.
The detail
- It’s the job’s construction phase plan under CDM 2015.
- R32 has no smell and is heavier than air. No flame within 3 m of the outdoor unit or a cylinder, a detector running while the circuit is open, and nitrogen let out outdoors.
- Liquid refrigerant can cause cold burns, so gloves and glasses go on. Cylinders travel upright and secured, never in the cab. Units are lifted by two people or a lifting aid.
What we never do
- Let refrigerant out into the air.
- Top up a leaking system instead of fixing the leak.
- Use a flame indoors unless the survey planned it.
- Charge a system that hasn’t passed its pressure test and vacuum.
- Reuse old pipework.
- Do the electrics ourselves.
Questions worth asking any installer
- How will you test the pipework before the refrigerant goes in?
- How deep a vacuum do you pull, and do you check it holds?
- Is the refrigerant weighed, and does the label show the total?
- Who does the electrics, and whose name is on the certificate? Who tells building control?
- Are the engineer and the company both F-Gas certified? Ask to see the engineer’s certificate, and for the company’s number.
Eleven questions for any installer →
Written October 2026, published November 2026.